Independent engineering design of recirculating aquaculture systems (RAS) for grow-out farms, hatcheries and broodstock units. Supplier-neutral: equipment is selected for your species, site and budget, not for a catalogue.
Grow-out RAS farms
Hatcheries and broodstock units
Investors comparing supplier proposals

Biomass model by month, stocking density, feeding and harvest schedule.
O₂, CO₂, TAN and suspended solids — the basis for sizing every unit.
Mechanical filtration, biofiltration, degassing, oxygenation, disinfection, heating or cooling.
Tank system, flows and pumping adapted to species and site.

Building layout, tank arrangement and service areas.
Process flow diagram and piping & instrumentation diagram.
Bill of quantities and technical specifications for supplier tenders.

Investment and operating cost, cost per kg of fish. See what drives RAS fish farm cost.
Independent comparison of RAS supplier and turnkey contractor offers on equal terms. How to compare RAS suppliers.
Installation control on the client’s side, start-up, biofilter maturation and first stocking.
Technology choice, layout and budget estimate. When: before the investment decision.
Mass balance, equipment sizing, CAPEX/OPEX. When: financing, permits, supplier tenders.
Drawings, P&ID, specifications. When: construction and procurement.
Installation control and commissioning on the client’s side. When: construction and start-up.
2025
Detailed Design
Equipment Supply
Supervised installation
2024
Detailed design, supervised installation
2018
Detailed design
2017
Detailed design

Species, target production (t/year or fingerlings/year), site location and water source.
It depends on capacity and design stage. A fixed quote follows the free initial project review.
Construction cost depends on species, capacity, site and climate. A CAPEX/OPEX estimate is prepared at the concept stage, before the investment decision.
Sturgeon and caviar, rainbow trout, Arctic char, African catfish, tilapia, carp, king crab, sea cucumber, lobster and seaweed.
Yes, on the client’s side: we prepare the independent design and specifications that contractors bid on, review their proposals and supervise construction.
Yes, as an option. After the design is approved, equipment supply and installation supervision can be arranged — as in recent African catfish and trout projects.